Exploration drilling at Incahuasi: a very complex technique

When the size of a gas field cannot be determined from seismics, the only way to delimit the reservoir is to drill an exploration well. That's the highly precise job of Carlos Augusto Rojas, a Drilling Engineer with Total E&P Bolivia.

Share this content

  • LinkedinShare