Home
UK North Sea: Glenelg field starts up
Print
Mar. 29, 06

Total announces the start of production of the Glenelg gas and condensates field, located 240 kilometres east of Aberdeen in a water depth of about 100 metres.

The Glenelg development has been a technical challenge for Total. The Group managed to successfully drill a highly deviated well of 7300 metres in length from the Elgin platform. The well reached its target at a depth of 5600 metres below sea level in a very high temperature and high pressure reservoir (200 degrees Celsius and 1150 bars).

This well has a production potential of about 30,000 barrels of oil equivalent per day.

The production from Glenelg will be processed and exported through the existing Elgin-Franklin facilities and will contribute to extend their gas production plateau at a level of 15.5 million cubic metres per day (around 550 million cubic feet per day).

Total, operator with a 49.47% interest, is partnered in Glenelg with E.ON Ruhrgas (18.57%), BG International (14.7%), GDF (9.26%) and Eni (8%).

The Glenelg success illustrates the willingness of the Group to deploy its technical expertise to valorise, through innovative projects, hydrocarbon reserves which were not developable up to now.

 

 

For further information, please contact:
Tel. : +33 (0) 1 47 44 46 99 - Fax : +33 (0) 1 47 44 68 21
 Send an e-mail to Media Relations

Send by e-mail Back to top
  
   RSS Feed

Subscribe to Press Releases RSS feed
   E-mail Alerts

Get the latest news by e-mail
   Environment and Society

Consult the section
   Total in 2007

Consult the document
   Registration Document 2007

Download the Registration Document 2007 (pdf file)
link to legal link to site map link to glossary link to RSS Feeds link to E-mail Alerts