Home
Libya's Offshore Al Jurf Field in Block C 137 Starts Production
Print
Sep. 05, 03
Total announces the start of production from Libya's Al Jurf field in Block C 137 located around 100 kilometers offshore in water depths of 90 meters.

Total, operator of the block with a 37.5% interest, is partnered with Wintershall (12.5%) and the Libyan National Oil Corporation NOC (50%).

The Al Jurf field development consists of a platform with 10 production wells connected to a floating production storage offloading (FPSO) vessel named Farwah. The FPSO has a storage capacity of more than 900,000 barrels. Production will be 40,000 barrels of oil per day once the field reaches plateau.

This commencement of production will reinforce Total's position in Libya. In this country, Total already operates the Mabruk field located in the west of the Sirte Basin producing 18 000 barrels of oil daily. Total also holds 30% of the foreign partner's interest in El Sharara field (NC 115) in the Murzuk Basin, and which produces around 180 000 barrels of oil per day. In addition, the Group is also present in exploration in the Murzuk Basin (blocks NC 186, 187, 190 and 191) and Sirte (block NC 192).

Send by e-mail Back to top
  
   RSS Feed

Subscribe to Press Releases RSS feed
   E-mail Alerts

Get the latest news by e-mail
   Environment and Society

Consult the section
   Total in 2007

Consult the document
   Registration Document 2007

Download the Registration Document 2007 (pdf file)
link to legal link to site map link to glossary link to RSS Feeds link to E-mail Alerts