Exploration & Production Operations in Europe
Denmark
In Danemark, Total has owned since June 2010 an 80% stake in and the operatorship for licenses 1/10 (Nordjylland) and 2/10 (Nordsjaelland, formerly Frederoskilde). These onshore licenses, the shale gas potential of which has yet to be assessed, cover areas of 3,000 km2 and 2,300 km2, respectively. Following geoscience surveys on license 1/10 in 2011, the decision was made to drill a well during the second half of 2012. Geoscience surveys are ongoing on license 2/10.
France
On the Lacq field, operated since 1957, a carbon capture and storage pilot was commissioned in January 2010, and carbon injection is expected to continue until 2013. In connection with this project, a boiler has been modified to operate in an oxy-fuel combustion environment and the carbon dioxide emitted is captured and re-injected in the depleted Rousse field. As part of Total’s sustainable development policy, this project will allow the Group to assess one of the technological possibilities for reducing carbon dioxide emissions. For additional information, see Chapter 12.
The Montélimar exclusive exploration license, awarded to Total in March 2010 (100%) to assess, in particular, the shale gas potential of the area, was revoked by the government in October 2011. This revocation stemmed from the law of July 13, 2011, prohibiting the exploration and extraction of hydrocarbons by drilling followed by hydraulic fracturing. The Group had, however, submitted the required report to the government, in which it undertook not to use hydraulic fracturing in light of the current prohibition. An appeal has therefore been filed in December 2011 with the administrative court requesting that the judge cancel the revocation of the license.
Italy
In Italy, the Tempa Rossa field (75%, operator), discovered in 1989 and located on the unitized Gorgoglione concession (Basilicate region), is one of Total’s principal assets in the country.In 2011, Total Italia acquired an additional 25% in the Tempa Rossa field, bringing its stake to 75%, as well as shares in two exploration licenses.
Site preparation work started in early August 2008, but the proceedings initiated by the Prosecutor of the Potenza Court against Total Italia led to a freeze in the preparation work (for additional information, see Chapter 7, Legal and arbitration proceedings). New calls for tenders were launched related to certain contracts that had been cancelled. Drilling of the Gorgoglione 2 appraisal well that started in June 2010 reached its final depth, confirming the results of the other wells. It is expected to be tested in 2012. The extension plan for the Tarente refinery export system, needed for the development of the Tempa Rossa field, was submitted to the Italian authorities in May 2010 and approved at the end of 2011. Site preparation work began and start-up of production is expected in 2015 with a capacity of 55 kboe/d.
Norway
- In the Norwegian North Sea, where numerous development projects have recently been launched, the Group’s production was 205 kboe/d in 2011. The most substantial contribution to production, for the most part non-operated, comes from the Greater Ekofisk Area (Ekofisk, Eldfisk, Embla, etc.).
Several projects are underway on the Greater Ekofisk Area, located in the south. The Group owns a 39.9% stake in the Ekofisk and Eldfisk fields. The Ekofisk South and Eldfisk 2 projects were launched in June 2011 following approval of the development and operation plans by the authorities. The project relating to the construction and installation of the new Ekofisk living quarters and utilities platform is now in its second year.
- On the Greater Hild Area, located in the north and in which theGroup has a 51% stake (operator), the Hild development scheme was selected at the end of 2010. The development and operation plan has been submitted to the authorities in early 2012. Approval is expected in 2012, with production start-up scheduled for 2016.A number of successful exploration and appraisal activities were carried out in the North Sea in the 2009-2011 period. These activities have led to the launch of several development projects, which are already underway or for which approval by the authorities is expected in 2012: In the central section of the North Sea, on license PL102C (40%, operator), a fast-track development project has been launched for the Atla field (formerly known as David), which was discovered in 2010. Start-up of gas production is expected in late 2012.
Gas production on the Beta West field (a satellite of Sleipner, 10%), located in the central section of the North Sea, started in April 2011. In the Visund area of the Nordic North Sea on license PL120 (7.7%), the Visund South fast-track development project for the Pan/Pandora discoveries is underway. Start-up of production is expected in 2012.
The Stjerne project was launched in 2011 to develop the Katla structure discovered in 2009, located on license PL104 (10%) south of Oseberg in the Nordic North Sea. Start-up of oil production is expected in 2013.
The fast-track development project for the Vigdis North East structure (PL089, 5.6%), discovered in 2009 and located south of Snorre, was launched in 2011. It will also allow for enhanced hydrocarbon recovery from the nearby Vigdis East field. Start-up of oil production is expected in late 2012.
A positive appraisal well was drilled in 2010 on the southern slope of the Dagny-Ermintrude structure (6.54%) north of Sleipner. Approval of the development project is expected at the end of 2012 and production is scheduled to start in late 2016.
- In the Norwegian Sea, the Haltenbanken area includes the Tyrihans (23.2%), Mikkel (7.7%) and Kristin (6%) fields as well as the Åsgard (7.7%) field and its satellites Yttergryta (24.5%) and Morvin (6%). Morvin started up in August 2010 as planned, with two producing wells. In 2011, the Group’s production in the Haltenbanken area was 63 kboe/d.
The partners decided to go ahead with the Åsgard sub-sea compression project, which will increase hydrocarbon recovery on the Åsgard and Mikkel fields, and the development and operation plan has been submitted to the authorities. In 2011, Total successfully drilled an exploration well on the Alve North structure on license PL127 (50%, operator) near the Norne field.
- In the Barents Sea, LNG production on Snøhvit (18.4%) started in 2007. This project includes development of the Snøhvit, Albatross and Askeladd natural gas fields, as well as the construction of the associated liquefaction facilities. Due to design problems, the plant experienced reduced capacity during the start-up phase. A number of maintenance turnarounds were scheduled to address the issue and the plant is now operating at its design capacity (4.2 Mt/y). In 2011, the Group’s productionwas 19 kboe/d.
In 2011, Total drilled a positive exploration well on the Norvarg structure in the Barents Sea on license PL535 (40%, operator), which was awarded during the twentieth licensing round. The Group improved its asset portfolio in Norway by obtaining new licenses and divesting a number of non-strategic assets:
In 2011, Total obtained four new exploration licenses during licensing round APA 2010 (Awards in Predefined Areas), including one as operator. The Group also acquired in 2011 a 40% stake and the role of operator of license PL554, north of Visund. Drilling of an exploration well is expected on the license in 2012. At the beginning of 2012, during licensing round APA 2011, Total obtained eight new licences, including five as operator.
In 2010, the Group divested its stake in the Valhall/Hod fields. In June 2011, Total announced that it had signed an agreement for the planned sale of its entire stake in Gassled (6.4%) and the associated entities. The sale was effective at the end of 2011.
Netherlands
In the Netherlands, Total has had natural gas exploration and production operations since 1964 and currently owns twenty-four offshore production licenses, including twenty that it operates, and two offshore exploration licenses, E17c (16.92%) and K1c (30%).
In 2011, the Group’s production was 38 kboe/d, compared to 42 kboe/d in 2010 and 45 kboe/d in 2009. The K5CU development project (49%, operator) was launched in 2009 and production started up in early 2011. This development includes four wells supported by a platform that was installed in 2010 and connected to the K5A platform by a 15 km gas pipeline. The K4Z development project (50%, operator) began in 2011.
This development is comprised of two sub-sea wells connected to the existing production and transport facilities. Start-up of production is expected in early 2013. In late 2010, Total disposed of 18.19% of its equity stake in theNOGAT gas pipeline and decreased its stake to 5%.
Poland
In Poland, at the end of March 2011, Total signed an agreement to acquire a 49% stake in the Chelm and Werbkowice exploration concessions in order to assess their shale gas potential. On the Chelm license, drilling has taken place, the well has been tested and the results from the well are being examined.
United Kingdom
In United Kingdom, where Total has had operations since 1962, the Group’s production was 169 kboe/d in 2011, compared to 207 kboe/d in 2010 and 217 kboe/d in 2009. Around 90% of this production comes from operated fields located in two major zones: the Alwyn zone in the northern North Sea, and the Elgin/Franklin zone in the Central Graben.- On the Alwyn zone, start-up of satellite fields or new reservoir compartments allowed production to be maintained. The N52 well drilled on Alwyn (100%) in a new compartment of the Statfjord reservoir came onstream in February 2010 with initial production of 15 kboe/d (gas and condensates). The N53 well was also drilled on Alwyn on the same type of reservoir in 2011and came onstream in September 2011 with initial production of 4 kboe/d (gas and condensates).
The development project for Islay (100%), a gas and condensates discovery made in 2008 located south of Alwyn, was approved in July 2010. Development is underway and production start-up is expected in the first half of 2012 with a production capacity of 15 kboe/d.
- In 2010, Total signed an agreement to divest its stake in the Otter field; its holding fell from 81% to 50% in 2011 and was completely disposed of in February 2012.
- In the Central Graben, the development of the Elgin (46.2%, operator) and Franklin (46.2%, operator) fields, in production since 2001, contributed substantially to the Group’s presence in the United Kingdom. At the end of 2011, Total acquired the remaining 22.5% of Elgin Franklin Oil & Gas (EFOG), a company through which it holds a stake in the Elgin and Franklin fields. On the Elgin field, a first infill well came onstream in October 2009 with production of 18 kboe/d. A second infill well started up in May 2010 with production of 12 kboe/d.
Following a gas leak on the Elgin field on March 25, 2012, the production on the Elgin, Franklin and West Franklin fields was stopped and the personnel of the site were evacuated. Investigations are ongoing to determine the causes and the remediation of the gas leak. The Group is actively monitoring the situation (situation as of March 26, 2012).
Additional development of West Franklin through a second phase (drilling of three additional wells and installation of a new platform connected to Elgin) was approved in November 2010. Start-up of production is expected at year-end 2013. The decision was made in 2011 to install a new well platform on the Elgin field. This new platform will be installed in parallel with the West Franklin project and will enable the drilling of new wells on the Elgin field as of 2014.
In addition to Alwyn and the Central Graben, a third area, West of Shetland, is undergoing development. Total increased its equity stake to 80% in the Laggan and Tormore fields in early 2010.
The decision to develop the Laggan/Tormore fields was made in March 2010 and production is scheduled to start in 2014 with an expected capacity of 90 kboe/d. The joint development scheme selected by Total and its partner includes sub-sea production facilities and off-gas treatment (gas and condensates) at a plant located near the Sullom Voe terminal in the Shetland Islands. The gas would then be exported to the Saint-Fergus terminal via a new pipeline connected to the Frigg gas pipeline (FUKA).
In 2010, the Group’s stake in the P967 license (operator), which includes the Tobermory gas discovery, increased to 50% from 43.75%. This license is located north of Laggan/Tormore.In early 2011, a gas and condensate discovery was made on the Edradour license (75%, operator), near Laggan and Tormore.The development of Edradour using the infrastructures in placeis being examined.
Total has stakes in ten assets operated by third parties, the most important in terms of reserves being the Bruce (43.25%) and Alba (12.65%) fields. The Group disposed of its stake in the Nelson field
(11.5%) in 2010.
Source : Registration Document 2011